Home » News » Installing the expansion tank.
Managing Director – Bridge Classic Cars
The refurbished expansion tank is now installed.
Work is now underway on installing the full wiring loom. Once the rear section of wiring is complete the fuel tank can be fitted into position which will draw to a close the work on the rear section of the build.