Maserati Merak paintwork sign off

By Craig Ranson
By Craig Ranson

Managing Director – Bridge Classic Cars

[vc_row][vc_column][vc_column_text]The paintwork is now into the final stages of completion.

As with all classic car projects, it is vital to carefully inspect every stage before moving on to the next.  It is often easier to find the imperfections at every stage then to try and do it all at the end, when more often that not, it is too late.

The paint is looking absolutely stunning, a few minor alterations need to be made but we should be ready to move on within a week![/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_gallery type=”image_grid” images=”2339,2338,2337,2336,2335,2334,2333″][/vc_column][/vc_row]

Share this post
Enjoyed this article by Craig Ranson?
Email Craig Ranson