[vc_row][vc_column][vc_column_text]Tommy has had a good, solid two days of welding on the Mercedes 230E, tackling the corrosion and affected areas.
All of the rot has been cut away, metalwork is now being re-fabricated back into the body before being treated. We estimate another couple of days on the bodywork before we let her loose with our paint guys to make her pretty once again.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_gallery type=”image_grid” images=”20229,20230,20231,20232,20233,20234″][/vc_column][/vc_row]